11kV & 33kV grid connection and substation construction in Nigeria

Turnkey HV grid connections: DisCo approvals, line extension, pole-mounted and ground substations, NEMSA testing and energisation — handed over working.

11kV pole-mounted transformer substation built by Ionir Integral for a telecom site in Ikorodu, Lagos

Getting a site onto the national grid in Nigeria is rarely just "install a transformer". It is a chain of approvals, materials, civil works, line work, testing and coordination with the distribution company (DisCo) — and if one link slips, the site stays on diesel. Ionir Integral runs the whole chain, from the first load survey to the moment the meter starts counting.

What a turnkey grid connection includes

We deliver 11kV and 33kV connections for telecom towers, factories, warehouses, estates, schools and places of worship. Every job follows the same documented path:

  1. Site & load assessment — we measure actual and projected demand, then size the transformer and protection so you are not paying for idle capacity.
  2. Design & DisCo approval — single-line diagram, route survey and application to the DisCo covering your area (in Lagos, typically Eko or Ikeja Electric).
  3. Procurement — transformers, concrete poles, conductors, insulators, isolators and fuses from approved manufacturers.
  4. Construction — pole planting, line stringing, substation erection, earthing and LV distribution.
  5. Testing & certification — insulation resistance, earth resistance and transformer tests, followed by NEMSA inspection.
  6. Energisation & handover — coordinated switch-on with the DisCo, metering, and a handover pack with as-built drawings and test results.

Pole-mounted or ground-mounted?

Most telecom sites and small commercial loads are best served by a pole-mounted substation: quicker to build, smaller footprint, lower civil cost. Larger industrial loads usually need a ground-mounted or compact substation with proper switchgear. We recommend the option that meets your load and the DisCo's standards at the lowest lifetime cost — read our comparison.

Proof you can check

Every stage is recorded with geotagged, time-stamped photos, so remote project managers and investors can verify progress without travelling to site. See examples in our project field log — including grid connections delivered for ATC Nigeria, IHS Towers and Pan African Towers.

FAQ

Grid Connection & Substations: common questions

Related guides

How long does an 11kV grid connection take in Lagos?

Construction itself usually takes 2–6 weeks depending on line length and substation type. The total timeline is driven mostly by DisCo approvals and transformer availability, which we start on day one and track for you.

Do you handle the DisCo and NEMSA paperwork?

Yes. We prepare and submit the design, follow up the technical evaluation with the DisCo, and arrange NEMSA inspection and certification before energisation.

Can you connect a telecom tower that currently runs on generators?

Yes — this is our core work. We extend the HT line, install a pole-mounted substation and integrate it with the existing generator and batteries through an automatic transfer switch, so the site falls back to diesel only when the grid is down.

Request a quote

Let's price your project

Five quick steps, about two minutes. A real engineer reads every request and comes back to you within one business day.

What can we help you with?

Pick the closest match. We'll take you straight to the next step.

What kind of site is it?

This tells us which crew and which standards apply.

A few project details

Rough answers are fine. The more we know, the sharper the price.

When do you need it done?
How many sites?
Who should we get back to?

We only use these details to reply about this request.

Check everything looks right

Tap Edit to change anything. Nothing is sent until you press the button below.

Step 1 of 5