ENERGISED
Oshodi-Isolo, Lagos04 JUL 2025
IHS Towers
Transformer substation installation for IHS Towers, Oshodi-Isolo
Oshodi-Isolo, Lagos
Case study · ATC Nigeria
New 11kV spur, pole-mounted transformer substation and protection for an ATC Nigeria telecom tower, energised and handed over.
ATC Nigeria engaged Ionir Integral to connect one of its Ikorodu telecom towers to the 11kV network, reducing the site's reliance on generator power.
We extended an 11kV spur to the site, erected a two-pole H-frame substation carrying the transformer, isolators and drop-out fuses, and installed earthing and surge protection. The LV side was connected into the site's power system.
Construction was recorded from September 2024 and the substation was energised in October 2024, with the full photo record — site ID, coordinates and timestamps — delivered to the client.
Field log
ENERGISED
Oshodi-Isolo, LagosIHS Towers
Oshodi-Isolo, Lagos
ENERGISED
6.6143°N 3.5827°EATC Nigeria
Ijede Road, Ikorodu, Lagos
ENERGISED
6.5494°N 3.4794°EPan African Towers
Ikorodu & Ibeshe, Lagos